BATHROOM RENOVATION — MANOR PARK
Project Info
Client
Mr. Mark A
Location
Clavering Rd, London E12 5EY
Category
Residential Property
Type
Renovation
Tages:
Electrical, Plumbing, Installation, Plastering, Tiling, Paint, Waterproofing
Share
Project Description
- Dismantling the old tiles, bathtub, toilet, and sink — Removing existing elements to prepare for the renovation.
- Removing the old flooring — Preparing the base for new flooring.
- Waterproofing the floor — Applying a waterproof layer on the floor before laying the tiles to protect against water penetration.
- Laying tiles on the walls and floor — Installing ceramic tiles, creating a protected and aesthetically pleasing surface.
- Installing the bathtub, toilet, and sink — Fitting plumbing fixtures according to the bathroom design.
- Installing faucets, taps, and a towel dryer — Adding functional fixtures and convenient accessories.
- Replacing the electrical system and installing light fixtures — Updating the electrical installations for safety and comfort.
- Replacing pipes — Upgrading the water supply and sewage systems.
- Installing a gypsum board ceiling — Creating a perfectly smooth ceiling with gypsum board.
- Painting the ceiling — Final decoration of the ceiling with paint.
- Installing the door — Completing the renovation with the installation of a new door that matches the bathroom interior.
REVIEW
We renovated our bathroom, and the outcome really pleased us. Everything looks perfect — the new tiles, plumbing, and light fixtures have given the room a modern look. The professionals handled the work, so everything went smoothly and without delays. Very satisfied and confidently recommend these guys!