BATHROOM RENOVATION — MANOR PARK

Project Info

Client

Mr. Mark A

Location

Clavering Rd, London E12 5EY

Category

Residential Property

Type

Renovation

Tages:

Electrical, Plumbing, Installation, Plastering, Tiling, Paint, Waterproofing

Share

Project Description

  1. Dismantling the old tiles, bathtub, toilet, and sink — Removing existing elements to prepare for the renovation.
  2. Removing the old flooring — Preparing the base for new flooring.
  3. Waterproofing the floor — Applying a waterproof layer on the floor before laying the tiles to protect against water penetration.
  4. Laying tiles on the walls and floor — Installing ceramic tiles, creating a protected and aesthetically pleasing surface.
  5. Installing the bathtub, toilet, and sink — Fitting plumbing fixtures according to the bathroom design.
  6. Installing faucets, taps, and a towel dryer — Adding functional fixtures and convenient accessories.
  7. Replacing the electrical system and installing light fixtures — Updating the electrical installations for safety and comfort.
  8. Replacing pipes — Upgrading the water supply and sewage systems.
  9. Installing a gypsum board ceiling — Creating a perfectly smooth ceiling with gypsum board.
  10. Painting the ceiling — Final decoration of the ceiling with paint.
  11. Installing the door — Completing the renovation with the installation of a new door that matches the bathroom interior.

REVIEW

We renovated our bathroom, and the outcome really pleased us. Everything looks perfect — the new tiles, plumbing, and light fixtures have given the room a modern look. The professionals handled the work, so everything went smoothly and without delays. Very satisfied and confidently recommend these guys!

Do you have a project we can help with?

Прокрутить вверх